Sobha Central Phase 1 is a mixed-use development on Sheikh Zayed Road, adjacent to Jumeirah Lake Towers. The project consists of six residential towers, with the tallest reaching 360 meters across 95 floors — the highest residential tower in the JLT district. Phase 1 offers 1- and 2-bedroom apartments starting from AED 1.5 million, designed with a focus on build quality and spatial layout.
The development sits on Sheikh Zayed Road with direct access to Dubai Marina (10 minutes), Business Bay (12 minutes), Downtown Dubai (15 minutes), and DIFC (15 minutes). Metro connectivity is nearby, supporting daily commutes and access to key business and leisure districts across the city.
The project integrates residential, retail, and office space within a single master plan. A 160,000 sq ft retail podium includes shops and cafés, while 175,000 sq ft of office space caters to professionals. Around 250,000 sq ft of landscaped parks and green zones are distributed across the development. Amenities include swimming pools, rooftop terraces, a gym, cinema, co-working facilities, children's play areas, and 24/7 security with smart building management.
Sheikh Zayed Road maintains strong rental demand due to its central position and transport links. The mixed-use format creates internal foot traffic and supports occupancy rates. Sobha Realty manages construction in-house, from material manufacturing to on-site quality control, which has historically contributed to delivery consistency. Units are scheduled for handover in Q2 2030.
Sobha Central Phase 1 by Sobha Realty in Sheikh Zayed Road, Dubai is scheduled for handover in Q2 2030 (April–June 2030). Construction is estimated at ~25% based on the developer's reported phase.
The headline payment plan for Sobha Central Phase 1 is 10/50/30. See the full breakdown of booking, construction and post-handover instalments in the Financials tab.
Sobha Central Phase 1 offers 2 unit types:
Estimated gross rental yield: 7% p.a., benchmarked against current Sheikh Zayed Road rental data.
~25% — estimated from construction phase.