Azizi Riviera 66 is a waterfront residential tower in Meydan, part of Mohammed Bin Rashid City. The project sits within the Riviera master community, a lagoon-centered development inspired by Mediterranean coastal living. It offers studios and 1–3 bedroom apartments with views over the lagoon or city skyline.
The tower is minutes from Dubai International Airport and sits close to Al Khail Road and Sheikh Zayed Road. Downtown Dubai, the Burj Khalifa, and Meydan Racecourse are all a short drive away. The surrounding Riviera development includes retail, dining, and pedestrian promenades along the water.
The building features a curved façade with vertical greenery and floor-to-ceiling windows. Interiors use marble, quartz, and metallic finishes. Each apartment includes a private balcony. Energy-efficient systems and solar integration are part of the design.
Residents have access to a rooftop infinity pool, poolside cabanas, a glass-enclosed gym, yoga studio, basketball court, and rooftop lounge. Family facilities include indoor and outdoor play areas. The building also offers BBQ zones, a residents' clubhouse, and landscaped gardens with palm-lined walkways.
Completion is scheduled for May 2027. The development is freehold and positioned within a district experiencing growth in demand. Flexible payment plans are available during construction.
Azizi Riviera 66 by Azizi Developments in Meydan, Dubai is scheduled for handover in Q2 2027 (April–June 2027). Construction is estimated at ~25% based on the developer's reported phase.
The headline payment plan for Azizi Riviera 66 is 10/20/70. See the full breakdown of booking, construction and post-handover instalments in the Financials tab.
Azizi Riviera 66 offers 4 unit types:
Estimated gross rental yield: 6.5% p.a., benchmarked against current Meydan rental data.
Azizi Riviera 66 is the 8th of 9 Azizi Riviera projects currently tracked in Meydan, Dubai — the lineup starts from AED 480K with handovers scheduled across Q1 2027 → Q2 2027. Compare all 9 on the Azizi Riviera masterplan hub.
| Tower | Entry | Handover | Payment plan |
|---|---|---|---|
| Azizi Riviera 49 | AED 1.61M | Q1 2027 | TBA |
| Azizi Riviera 53 | AED 510K | Q1 2027 | 10/20/70 |
| Azizi Riviera 54 | AED 660K | Q2 2027 | TBA |
| Azizi Riviera 55 | AED 1.24M | Q1 2027 | TBA |
| Azizi Riviera 58 | AED 1.20M | Q2 2027 | 10/20/70 |
| Azizi Riviera 60 | AED 1.20M | Q1 2027 | 10/20/70 |
| Azizi Riviera 64 | AED 480K | Q2 2027 | TBA |
| Azizi Riviera 66(this page) | AED 1.18M | Q2 2027 | 10/20/70 |
+1 more Azizi Riviera tower — see full lineup on the hub.
~25% — estimated from construction phase.