The Meriva Collection is a beachfront residential development by Ellington Properties on Dubai Islands. It comprises multiple low-rise buildings designed to maximise sea views and privacy, with each residence featuring floor-to-ceiling windows, spacious balconies, and direct beach access.
Situated on Dubai Islands, the project offers island living with access to Dubai's business districts, airports, and lifestyle destinations. Residents benefit from a waterfront setting while remaining connected to the city's core infrastructure.
The development includes 1-, 2-, and 3-bedroom apartments, plus 3-bedroom penthouses. Unit sizes range from 800 sq ft (1-bed) to 5,600 sq ft (penthouses). Starting prices begin at AED 2,700,000. All units are freehold and feature contemporary coastal design with an emphasis on natural light and outdoor space.
Facilities include an indoor swimming pool, gymnasium, landscaped gardens, children's play area, restaurants, and 24/7 CCTV security. An on-site hotel managed by an international operator provides concierge services, spa facilities, and event spaces for residents. Private beach access and waterfront promenades are integrated throughout the community.
The payment plan is 70% during construction and 30% on handover. Completion is scheduled for December 2031. The project targets families and professionals seeking a low-density beachfront environment with hotel-grade services and strong rental potential.
The Meriva Collection by Ellington in Dubai Islands, Dubai is scheduled for handover in Q4 2031 (October–December 2031). Construction is estimated at ~25% based on the developer's reported phase.
The headline payment plan for The Meriva Collection is 70/30. See the full breakdown of booking, construction and post-handover instalments in the Financials tab.
The Meriva Collection offers 4 unit types:
Estimated gross rental yield: 7% p.a., benchmarked against current Dubai Islands rental data. Entry pricing works out to AED 482 – 7,375 per sqft, with estimated capital appreciation of 23% to handover.
~25% — estimated from construction phase.